ISTS status sought for power project

0
980
LinkedIn
Facebook
Twitter
Whatsapp
Telegram
Copy link

The Power Transmission Corporation of Uttarakhand (PTCUL) is currently implementing a power transmission system that aims to take power from hydropower plants situated in the four major river basins in Uttarakhand to the central transmission grid maintained by the Power Grid Corporation of India through a common extra high voltage transmission system.

Pink_lightsThe project, the Uttarakhand Integrated Transmission Project (UITP), will cost approximately ₹25 billion (US$443 million) to develop.

PTCUL filed a petition before the Central Electricity Regulatory Commission (CERC) to have UITP recognized as an inter-state transmission system (ISTS) under the CERC (Sharing of Inter State Transmission Charges and Losses) Regulations, 2010.

You must be a subscribersubscribersubscribersubscriber to read this content, please subscribesubscribesubscribesubscribe today.

For group subscribers, please click here to access.
Interested in group subscription? Please contact us.

你需要登录去解锁本文内容。欢迎注册账号。如果想阅读月刊所有文章,欢迎成为我们的订阅会员成为我们的订阅会员

已有集团订阅,可点击此处继续浏览。
如对集团订阅感兴趣,请联络我们

LinkedIn
Facebook
Twitter
Whatsapp
Telegram
Copy link